A force of 42 N changes the length of Elastic X by 1.2 m while a force of 24 N changes the length of Elastic Y by 2.1
m. Calculate the work done on both Elastic X and Elastic Y. Solve this problem by showing your work in an
organized step-by-step fashion and include proper significant digits. (3 marks)

Respuesta :

The work done on  both Elastic X and Elastic Y is 25.2 J.

Work done on elastic X

The work done on the Elastic X is calculated as follows;

W = ¹/₂fx

where;

  • f is the applied force to material X
  • x is the extension of material X

W = ¹/₂(42)(1.2)

W = 25.2 J

Work done on elastic Y

The work done on the Elastic Y is calculated as follows;

W = ¹/₂fx

where;

  • f is the applied force to material Y
  • x is the extension of material Y

W = ¹/₂(24)(2.1)

W = 25.2 J

Thus, the work done on  both Elastic X and Elastic Y is 25.2 J.

Learn more about work done by elastic material here: https://brainly.com/question/16009484