It is TRUE that n the second-stage allocation in activity-based costing, overhead costs are allocated from activity cost pools to products.
Activity-based costing is a cost allocation system in which overhead costs are first assigned to activity cost pools before being allocated to products using activity measures.
Activity in an activity-based costing system is an event that consumes resources.
Thus, it is TRUE that n the second-stage allocation in activity-based costing, overhead costs are allocated from activity cost pools to products.
Learn more about activity-based costing at https://brainly.com/question/6654166