contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Which sentence is correct? powers or power Liquid oxygen and liquid hydrogen power the main engines of the space shuttle. Liquid oxygen and liquid hydrogen powe
Wrote a decimal and percent of 5/8​
Which of the following figures can be described as a three-dimensional solid made from stacking congruent circles? A. Cone B. Cylinder C. Cube D. Prism
The answer to number 2??
Pls help! i hate math its so confusing! pics down below! happy valentines day btw <3
Who suggested that a sneer retains elements of baring one's teeth so as to threaten predators? a. charles darwin b. william james c. stanley schachter d. walter
How do banks earn most of their income​
The part of the ocean floor that separates the oceanic rise from the thick continental crust and is between the shoreline and the continental shelf break is ca
How do you make banana bread? Lots of details please.
an ice cream shop has a total of 48 flavors of ice cream and toppings. if there are 16 flavors of ice cream, how many toppings can each child add if 8 children