With a planned volume of 15,000 units, the master budget includes variable costs of $450,000 and fixed costs of $350,000. If the actual volume is 12,000 units, the total costs under flexible budget should be:__________a. $490,000.b. $560,000.c. $650,000.d. $710,000.