Respuesta :
Answer:
The LHS constraint for Inspection time is the total amount of Inspection time used for all of the models produced. This is the sum of the products of the number of units produced and the inspection time required for each model.
LHS for Inspection time is calculated in Cell G25.
LHS represents how much of actual inspection time is consumed.
Formula used for calculating LHS,
G25 =SUMPRODUCT(D19:F19,D25:F25)
When This is the totality of the products of the number of units produced and the inspection period needed for each model: G25 = SUMPRODUCT(D19:F19, D25:F25)
What is the LHS constraint?
The LHS constraint for Inspection time is the complete charge of Inspection time used for all of the representatives produced. This is the totality of the products the number of units produced and the inspection time needed for each model.
LHS for Inspection time is estimated in Cell G25.
After that LHS represents how much of the actual inspection time is consumed.
Then the Formula used for calculating is = LHS,
Therefore, G25 =SUMPRODUCT(D19:F19,D25:F25)
Find more information about LHS constraint here:
https://brainly.com/question/6073946