osayword847 osayword847 14-02-2024 Engineering contestada No NOTAM action is required for NAVAIDs (TACAN, VOR, etc.) that are part of the National Airspace System if the time periods do not exceed ____. a) 24 hours b) 48 hours c) 72 hours d) 96 hours