A three-phase 440-V, 51-kW, 60-kVA inductive load operates at 60 Hz and is wy connected. It is desired to correct the power factor to 0.95 lagging. What value o capacitor bank must be placed in parallel with the three-phase load in order to raise the power factor of this load to 0.95 lagging? (a) Capacitor bank is star connected. (b) Capacitor bank is Delta connected.​